First Enquiry, Discovery and Feasibility

Follow a rational path from initial discussion to a funded engineering feasibility study.

  • By MySunDirection
  • 15 min read
Share this explanation
One-minute answer

You are moving a project through the decision covered by “First Enquiry, Discovery and Feasibility” and need evidence before the next commitment.

Understand what belongs in an initial enquiry, what a defined paid discovery should produce, and how a feasibility study converts important unknowns into evidence for a go, conditional-go, hold or no-go decision.

Select or check first
Payment does not predetermine the answer. A valuable study may conclude that the original idea should change, wait, use a standard product or stop. Its value lies in producing decision-quality evidence within the agreed scope.
Controlling assumption
Requirements, exclusions, evidence, responsibilities, acceptance criteria and change control are explicitly agreed.
Top risk
Copying a diagram, rating or example without matching the real topology, duty, environment and failure consequences can produce an unsafe or misleading result.
Proof
Check the exact manufacturer data, units and limits, then verify the result by calculation, measurement or a controlled acceptance test.
Start with the basics Optional foundation before “First Enquiry, Discovery and Feasibility”

Engineering-project basics

A build becomes controllable when the need, assumptions, interfaces, evidence and ownership are written before hardware choices become difficult to reverse.

Requirement
A requirement states a necessary, testable outcome or constraint. A preferred solution is not automatically a requirement.
Assumption
An assumption is treated as true for a decision but still needs an owner, evidence and a plan for what happens if it is wrong.
Verification and validation
Verification asks whether the design meets its specified requirements. Validation asks whether the delivered result solves the user’s real need in its intended setting.
Prototype and production release
A prototype answers selected questions. Production release additionally needs controlled parts, repeatable assembly, acceptance evidence, service information and change control.
Scope and change control
Scope defines included work, deliverables, interfaces and exclusions. Change control records why an approved baseline changes and what cost, schedule or risk follows.

How to use this article: For every decision, record the owner, evidence, acceptance criterion and condition that would force the decision to be reopened.

On this page
  1. A useful first enquiry describes the situation before prescribing the machine
  2. Use three decision gates with explicit outputs
  3. A paid discovery phase needs a defined statement of work
  4. Feasibility is a structured attack on the largest unknowns
  5. Finish with a decision, not a folder of unexplained files

An enquiry, a discovery engagement and a feasibility study are three different commitments. The enquiry tests whether there may be a sensible problem to explore. Discovery defines the question, evidence and deliverables of professional investigation. Feasibility then examines the most important technical, operational and commercial uncertainties. Keeping these gates distinct prevents a friendly first conversation from being mistaken for a quotation, design or promise to build.

A useful first enquiry describes the situation before prescribing the machine

The first conversation begins a decision path; it does not complete requirements, feasibility or design.
Diagram description

The proposed handling machine and four-step path are illustrative. No site survey, engineering analysis or supply commitment is shown.

Enough context to decide whether structured discovery is worthwhile
DescribeUseful detailsAvoid assuming
Current operationPeople, sequence, equipment, cycle, shifts and known interruptionsThat the visible manual step is the true constraint
Object or processRange of sizes, mass, materials, variation and sensitivityThat one sample represents production
Desired outcomeQuality, rate, exposure, traceability, energy or service targetThat “fully automatic” is a measurable requirement
Site contextSpace, utilities, environment, access and connected equipmentThat a concept can be installed without interface work
People and safetyOperators, maintainers, bystanders, access and foreseeable interventionsThat guards alone resolve every hazard
Business boundaryTiming, decision owner, investment range and reason for changeThat a budget is a fixed quotation or proof of viability

Photographs, short videos, process records, representative parts, drawings and nameplates can make an initial discussion concrete. Sensitive information should be shared through an agreed channel and only to the extent needed. The engineering team should state what has not been checked: an image cannot confirm dimensions, structural capacity, electrical condition, software ownership or safe access.

Use three decision gates with explicit outputs

Each stage purchases a different kind of certainty
GateMain purposeTypical outputWhat it is not
Initial enquiryCheck alignment, urgency and obvious constraintsRecorded problem statement, open questions and proposed next stepA completed design or firm performance commitment
Paid discoveryDefine investigation scope and gather controlled evidenceAgreed study plan, assumptions, interfaces, deliverables and responsibilitiesUnlimited consulting or hidden production engineering
Feasibility studyTest critical uncertainties and compare bounded conceptsEvidence, risks, options, estimate range and decision recommendationProof that detailed design and commissioning will be problem-free
Discovery pays for bounded investigation and documented outputs, not merely more conversation.
Diagram description

The screens, analysis and drawings are illustrative; actual deliverables depend on the signed discovery scope and available evidence.

Define both the work and the limits before it starts
Scope itemQuestions to settle
Decision to supportWhat decision will the study enable, who makes it and by when?
InputsWhich samples, records, drawings, site access and subject experts will be available?
ActivitiesWhich surveys, measurements, calculations, concept comparisons or trials are included?
DeliverablesWill outputs include requirements, concept layouts, risk register, tests, assumptions or estimate ranges?
ExclusionsWhich detailed drawings, code, certification, procurement or production work is outside the phase?
Ownership and confidentialityWho may use the outputs, models and data, and what remains background intellectual property?
AcceptanceHow will completion, review comments and corrected deliverables be handled?
Change controlWhat happens when new evidence changes the time, question or scope?

Feasibility is a structured attack on the largest unknowns

Feasibility integrates disciplines and interfaces; a checklist without evidence is not a completed study.
Diagram description

The machine and review sheet are conceptual. They do not represent a certified design, verified calculation or approved risk assessment.

Rank uncertainties by consequence and retire the important ones first
AreaRepresentative questionPossible evidence
ProcessCan the operation achieve the required result across representative variation?Sample trials, measurement study and failure cases
MechanicalCan the structure, motion and tooling carry loads with acceptable life and tolerance?Calculations, vendor data, models and targeted tests
Electrical and controlsAre power, sensing, actuation, interfaces and failure states practical?Load schedule, I/O concept, communications survey and state analysis
SafetyWhich hazards exist over use, setup, cleaning, maintenance and foreseeable misuse?Documented risk assessment and risk-reduction concept
EnvironmentWill heat, dust, water, vibration, corrosion or electromagnetic conditions matter?Site data, ratings review and environmental test plan
IntegrationCan the concept coexist with buildings, utilities, networks and adjacent equipment?Interface register, site survey and responsibility map
OperationCan people run, recover, clean and maintain it with available skills?Use cases, off-normal scenarios, access review and training concept
DeliveryAre cost, schedule, supply and support credible enough for the next decision?Range estimate, assumptions, lead-time evidence and risk register

Not every uncertainty needs a prototype. Some are resolved by a measurement, calculation, drawing review or authoritative component data. Others need a bench test because the interaction is not predictable with enough confidence. The study should explain why each method is proportionate, record assumptions and show residual uncertainty instead of converting it into false precision.

Finish with a decision, not a folder of unexplained files

A mature result preserves alternatives and conditions
OutcomeMeaningMinimum record
GoEvidence supports the next defined phaseSelected concept, requirements baseline, risks, budget range and next authorization
Conditional goProgress is sensible after named conditions are metCondition owner, evidence required, due point and effect if unmet
HoldThe idea may be viable but timing, inputs or business case are not readyReason, information gap and a review trigger
RedirectA different process, standard product or smaller intervention fits betterComparison and consequences of the recommended alternative
No-goRisk, capability or economics are outside the accepted boundaryEvidence, assumptions and conditions that could change the conclusion

A go decision authorizes only the next agreed phase; it is not production acceptance in advance. Preserve traceability from the original need through requirements, evidence and unresolved risk, then define how later verification will be recorded. The distinction between an encouraging demonstration and accepted equipment is explained in Prototype Proof Versus Production Acceptance. A clean study leaves both parties able to see what is known, what is assumed and what must happen next.

Selection boundary and evidence to keep with the decision

Treat “First Enquiry, Discovery and Feasibility” as a selection problem, not only a definition. Record the required result, alternatives considered, the controlling assumption and the condition that would change the choice.

Keep evidence proportional to consequence: Check the exact manufacturer data, units and limits, then verify the result by calculation, measurement or a controlled acceptance test. Revisit the decision when the load, environment, duty, interface, regulation or maintenance plan changes.

One-minute questions

Questions to answer before you apply this lesson

What should I select or check first for First Enquiry, Discovery and Feasibility?

Payment does not predetermine the answer. A valuable study may conclude that the original idea should change, wait, use a standard product or stop. Its value lies in producing decision-quality evidence within the agreed scope.

Which assumption can change the conclusion?

Requirements, exclusions, evidence, responsibilities, acceptance criteria and change control are explicitly agreed.

What can go wrong if I copy the example directly?

Copying a diagram, rating or example without matching the real topology, duty, environment and failure consequences can produce an unsafe or misleading result.

How do I verify the result in the real system?

Check the exact manufacturer data, units and limits, then verify the result by calculation, measurement or a controlled acceptance test.

Sources and further reading

  1. Systems Engineering Handbook: 4.1 Stakeholder Expectations DefinitionNational Aeronautics and Space Administration · 2026-10-13Primary handbook material reviewed for stakeholder identification, operational scenarios, measures of effectiveness, agreement, baselining and early capture of off-nominal conditions.
  2. Systems Engineering Handbook: 4.0 System Design ProcessesNational Aeronautics and Space Administration · 2026-10-13Primary handbook material reviewed for transforming stakeholder expectations into requirements, defining constraints, comparing alternatives through trade studies and documenting design decisions.
  3. Safety of machinery — General principles for design — Risk assessment and risk reduction (ISO 12100:2010)International Organization for Standardization · 2026-10-13Official standard record reviewed for machinery life-cycle hazard identification, risk estimation, risk evaluation, reduction, documentation and verification.